Produit

Contenu du sprint 7 du 28/09/2020 au 06/10/2020

Sprint 7 

Début: 28/09/2020

Fin: 06/10/2020.

Mise en production: 06/10/2020.

  • Deploy ArgoCD
  • Create a test architecture
  • Deploy test Pysae on EC2 with DocumentDB
  • Fix linter issues
  • Study the possibilities to send notification when the driver app is in the background
  • Document Editor exchange API
  • Study the possibilities to save the data when the driver app is in the background
  • Deploy docker image with Gitlab CI/CD
  • Dockerize Pysae services
  • Change password reset link in admin and clean the old page
  • Clean OP1 code in Pysae
  • Delete the page "Courses à proximité" in Driver
  • Create Tests for API endpoints used by Driver
  • Prepare an action plan to test Driver websocket
  • Implement a first test of Driver in browser stack
  • Document and Study endpoints API used by Driver
  • Document and Study websocket Driver
  • Delete the feature of the phone number in OP
  • Delete the shape import feature in the GTFS editor
  • Update targetSdkVersion Android Driver

Bon courage à toute l'équipe technique et à bientôt pour le suivi des évolutions.